ABFAB CONCRETE |
|
MIXED ON SITE TO GIVE YOU THE EXACT QUANTITY THAT YOU REQUIRE |
What
you get with ABFAB Concrete |
|
Friendly, helpful and reliable service |
|
Multiple Mix designs supplied from one delivery |
|
Free technical advice, by telephone or on site |
|
Deliver your order on a date and at a time to suit you |
|
Large or small loads delivered |
|
Small aggregate for ease of laying and finishing |
|
DIY and Trade welcome |
|
Concrete with confidence - MIXED ON SITE |
|
|
Abfab Concrete aim to take away the worry that you can get with a concrete delivery, so that you get just the amount of concrete to complete the job, the effort needed to complete the job is minimised and that you know the full cost of the job before delivery.
|
|
|
We are probably the only concrete company in Bristol that will give you the full price you can expect to pay for your delivery. Most companies will only answer your questions and will not offer the full information that you need to evaluate the different prices which you have got. Always remember that the price of a concrete delivery may comprise of a number of factors. We have constructed a list of the differences that you can expect to get between different concrete companies.
|
|
|
Essentially the main reasons for different pricing structures is that for a 'Ready Mixed Concrete' delivery the concrete comes to you already mixed and to the volume that you ordered over the telephone. With ABFAB the concrete is 'Mixed on Site' as it is being poured, so therefore we can much more accurately deliver the exact amount that you require. It may be very difficult to calculate before hand how much concrete is required, therefore having the concrete mixed on site you can control the price that you pay.
|
|
|
Compare a typical Ready Mixed Concrete Company with an ABFAB Concrete delivery. |
|
|
|
![]() |
|
ABFAB Volumetric Delivery |
Ready Mixed Delivery |
|
Abfab trucks carry dry materials ie: Sand, Stone, & Cement. The specification & slump are set on site, and can be changed to suit different applications as required on site at the time. |
Ready Mixed Concrete trucks carry: Concrete already mixed. The specification & slump are already determined at the batching plant. This cannot be changed on site.
|
| Delivery: "On Time", "Scheduled" & "Agreed" | Delivery: at "Suppliers Convenience" |
|
Advantage: Know manning costs We give you a time of delivery.
|
Disadvantage: Waiting Time. No definitive delivery times given.
|
|
Quantity: "Exact amount produced on site" |
Quantity: "Delivers what you think you need" |
|
Advantage: The exact amount is produced to finish the job. No waste! No shortage!
|
Disadvantage: Company deliver what you have ordered. Trucks do not carry extra concrete.
|
|
Payment: "Only pay for what you take" |
Payment: "Pay for what you order, needed or not" |
|
Advantage: Only pay for what you take We only charge you for what you use.
|
Disadvantage: Pay for what you ordered - whether you need it or not.
|
|
Penalties: "None. Fully inclusive pricing" |
Penalties: "Non expected charges after delivery" |
|
Advantage: We give you the price of the concrete all in. There are no hidden or extra charges. |
Disadvantage: Add on charges, not carried charge Part Load charge, time for offload, return charge |
|
Under Ordered: "We carry extra to finish the job" |
Under Ordered: "No extra carried, job unfinished" |
|
Advantage: We carry extra materials so that you can finish the job at the time.
|
Disadvantage: Ready Mixed trucks do not carry extra, and increase rate for another delivery. |
| Over Ordered: "We only charge for what you use" | Over Ordered: "Pay to take non - required away" |
|
Advantage: We mix as required so we can stop when you have got enough, saving waste & cost.
|
Disadvantage: Pay for quantity over ordered or pay to have taken back. |
|
Time Included: "We give up to 30mins for each m³" |
Time Included: "20 to 30 mins per delivery, max" |
|
Advantage: You don't have to rush to off load or dump it on the ground. Plenty of time for the job.
|
Disadvantage: Extra charges start after 20/30 mins typical £1 per minute. Could dump it on floor. |
|
Workability: "Mixed fresh, maximum working time" |
Workability: " Mixed before truck leaves yard" |
|
Advantage: No rush to lay, as it is mixed on site you have maximum time to lay.
|
Disadvantage: Concrete starts to set when loaded into truck, work time is reducing. |
|
Equipment: "6 metre chute & barrows on truck" |
Equipment: " No barrows, No extended chutes" |
|
Advantage: Chute to save effort of barrowing or cost of pump. Two barrows for awkward jobs.
|
Disadvantage: Without chute may have to be put onto ground and double handled. No equipment. |
| ABFAB Concrete Never Under Order, Never Over Order
|
|